Deck Re-build

This deck was built on the same footprint of the previous deck that failed prematurely due to poor framing and no drain water mitigation. This ground level deck was set on piers set 3 feet into the ground. Rain water and snow melt was handled by a sloped gravel base that directs the water to the rear of the property.

Deck Remodel

Categories: Featured, General | Tags: , , | Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>